Design
We design the charging layout for your site, from the chargers to the power kiosks.
EV charging is part of our electrical installation work, from design and installation through testing and commissioning to ongoing maintenance.
We design the charging layout for your site, from the chargers to the power kiosks.
We install the chargers with the groundworks, ducts and the power kiosks that feed them.
We test and commission every charger we install before it goes into use on your site.
We look after the charging we install with planned maintenance and breakdown support.

CHEP chose us as its preferred contractor to design and deliver its fleet charging. This is the work on the first 3 sites, which stayed live while we worked.
We dug trenches across the yards, laid ducts for power and data, set the charger bases and left every area as good as we found it or better.
We fitted the power kiosks that feed the chargers, with their bases, containment, internal wiring, protection, labels and documents.
We installed, tested and commissioned the standalone 30kW chargers, each one on its own base and fed from a power kiosk.

Pick your sector to see the work we have done for businesses like yours.
The team is friendly, professional, and always quick to respond if we had any questions or changes. You can tell they actually care about doing a good job, not just ticking boxes. We’ve seen a big improvement since bringing them on board, and I wouldn’t hesitate to recommend them to anyone looking for a reliable, down-to-earth company to work with.
Over the last 18 months Xeenie have provided PSL with a number of different services, including Main Control Panel builds and on-site IQOQ validation at client sites. All work has been performed to a very high standard and their breadth of knowledge and experience is clear to see
Xeenie Group are our preferred Installation and commissioning company when our in house team are fully utilised. Jared and Dan are always professional and have a wealth of knowledge and experience in the Healthcare and Pharma equipment industry
It was a pleasure working with both Jared and Daniel who showed their determination and drive to succeed and achieve the desired result. This was an easy project to deliver due to their enthusiasm and passion for their business growth and development. Achieving ISO9001:2015 registration was an important step towards that goal. Well done guys. Onwards & Upwards
The work started at Pontefract, Durham and Severnside and now covers 5 sites.
44
Chargers installed across 5 UK sites.
0
Safety incidents across all 5 sites, the first 3 delivered on time and to specification.
Give our office a call or send us a few details and we’ll be in touch.
Send an enquiry