Forklift charging bays in a CHEP depot yard, the chargers along a crash barrier by the loading doors

Case studies

Here is the work we have carried out for our clients, starting with the charging we designed and installed for CHEP’s electric fleet.

Featured project

Who we work with

  • Over the last 18 months Xeenie have provided PSL with a number of different services, including Main Control Panel builds and on-site IQOQ validation at client sites. All work has been performed to a very high standard and their breadth of knowledge and experience is clear to see

    Powder Systems Ltd

    Read more on control systems and on commissioning and validation.

  • Xeenie Group are our preferred Installation and commissioning company when our in house team are fully utilised. Jared and Dan are always professional and have a wealth of knowledge and experience in the Healthcare and Pharma equipment industry

    ESCO GB Ltd

    Read more on mechanical and electrical and on commissioning and validation.

What a full case study covers

The CHEP fleet charging case study is written up in 4 parts, from the brief to what the customer said.

  1. The brief

    Who the customer is, where the site is and what they asked us to do.

  2. The work

    What our engineers installed, tested and commissioned on site, stage by stage.

  3. The numbers

    The figures from the job, from the equipment installed to the safety record.

  4. What the customer said

    The customer’s own words about the job, exactly as they wrote them.

Tell us about your project

Give our office a call or send us a few details and we’ll be in touch.

Send an enquiry